Offshore Wind Journal

New safer vessel transfer system chosen for Sheringham Shoal

Taken from: Offshore Wind Journal September 2012


Scira Offshore Energy, operator of the Sheringham Shoal offshore windfarm, is to utilise Osbit Power’s MaXccess transfer system to provide windfarm technicians with safe and reliable access to wind turbines in a range of weather conditions. MaXccess was selected by the company after extensive trials, including some at Statoil’s Hywind demonstration floating wind turbine in Norway. Sheringham Shoal’s marine operations manager Meindert Jan van der Velde said: “Accessing tu....

Please login to read the rest of this story

Or click here to subscribe:




Your comment
<< back

LINKS

RELATED ARTICLES:

Wind energy “bright spot in otherwise grim report”...

24 May 2013

Investing in energy will pay dividends later...

22 May 2013

Meet the Riviera Team at Nor-Shipping...

20 May 2013

Investing in energy will pay dividends later...

20 May 2013

Project-driven approach can drive down costs...

15 May 2013

DP event sees key issues addressed by leading experts...

13 May 2013

Turbine vessel Sea Installer starts work ...

10 May 2013

Dearth of information means lessons aren’t being learned...

08 May 2013
navigation separator